- Utility connections
- Connections from the house to the water, electricity and sewerage networks. They are usually paid for separately from the price of the house.
- Self-promotion (self-build)
- Building your own home as the developer. It is financed with a self-build mortgage released in stages against certified progress on site.
- CLT (cross-laminated timber)
- Solid panels made of layers of timber glued crosswise. A fast structural system with good thermal performance.
- CTE (Spanish Building Code)
- Código Técnico de la Edificación: Spain’s basic building regulations, including energy efficiency requirements by climate zone.
- Light frame
- A structure of timber or steel studs (steel frame) with insulation between them, closed with boards.
- ICIO (construction tax)
- Tax on Construction, Installations and Works. It is charged by the local council, usually up to 4% of the construction budget.
- Self-build kit
- The builder supplies materials and plans; assembly, labour and finishes are up to you.
- Building permit
- Municipal permission to build. It requires an architect’s design approved by the professional association (visado).
- Turnkey
- The house is handed over finished and ready to move into. Always check which items are included.
- Specification of finishes
- A document detailing the materials, installations and finishes included in the price.
- 3D modular
- The house is built as almost finished volumetric modules that are transported and assembled on the plot.
- nZEB
- Nearly zero-energy building, required by the CTE for new builds.
- Passivhaus
- An independently certified very low energy standard: airtightness, insulation and ventilation with heat recovery.
- Ten-year structural insurance
- Compulsory insurance covering structural damage to a new home for 10 years.
- Semi-finished
- The builder delivers the structure, external walls and roof; you complete the services and interior finishes.