Prefab house glossary

Utility connections
Connections from the house to the water, electricity and sewerage networks. They are usually paid for separately from the price of the house.
Self-promotion (self-build)
Building your own home as the developer. It is financed with a self-build mortgage released in stages against certified progress on site.
CLT (cross-laminated timber)
Solid panels made of layers of timber glued crosswise. A fast structural system with good thermal performance.
CTE (Spanish Building Code)
Código Técnico de la Edificación: Spain’s basic building regulations, including energy efficiency requirements by climate zone.
Light frame
A structure of timber or steel studs (steel frame) with insulation between them, closed with boards.
ICIO (construction tax)
Tax on Construction, Installations and Works. It is charged by the local council, usually up to 4% of the construction budget.
Self-build kit
The builder supplies materials and plans; assembly, labour and finishes are up to you.
Building permit
Municipal permission to build. It requires an architect’s design approved by the professional association (visado).
Turnkey
The house is handed over finished and ready to move into. Always check which items are included.
Specification of finishes
A document detailing the materials, installations and finishes included in the price.
3D modular
The house is built as almost finished volumetric modules that are transported and assembled on the plot.
nZEB
Nearly zero-energy building, required by the CTE for new builds.
Passivhaus
An independently certified very low energy standard: airtightness, insulation and ventilation with heat recovery.
Ten-year structural insurance
Compulsory insurance covering structural damage to a new home for 10 years.
Semi-finished
The builder delivers the structure, external walls and roof; you complete the services and interior finishes.