Steelo 90 by Steelo



Description
Single-storey home of 90 m² built area and 77.35 m² usable area, with 3 bedrooms and 2 bathrooms. Delivered as complete shell construction; 20 days of effective work on site.
Automatically translated from Spanish.
Price basis: from €55,990, semi-finished finish, Fixed price + VAT, complete shell construction: galvanised steel structure, exterior boarding, waterproof barrier and sealing. Does not include foundations, delivery, technical project, licence or connections to mains services.. Includes: the house only. Images and plans may show extras.
Floor plan

Photos and plans
Images © Steelo.
Adapt the layout to your needs and discuss it with one of the builder’s advisers.
Features
| Energy efficiency | Class A |
| Construction system | Steel frame |
| Roof | Flat roof |
| Floors | 1 |
| Style | Modern |
| Built area | 90 m² |
| Recommended minimum plot | — |
| Construction time | — |
| Pool shown in image | No |
Price details
| House price (semi-finished) | €55,990 |
| + Foundations (estimated, not included) | €9,300 |
| + Transport (estimated, not included) | €2,800 |
| + Assembly and crane (estimated, not included) | €3,900 |
| + Architect’s design (estimated, not included) | €3,900 |
| + Licence and ICIO (estimated, not included) | €2,200 |
| + Utility connections (water, electricity, sewerage) (estimated, not included) | €9,000 |
| + Interior finishing (not included) (estimated, not included) | €19,600 |
| + VAT (10%) (estimated, not included) | €10,700 |
| Estimated total cost | €117,000 (±6 %) |
| Estimated monthly payment (80 % financed, 30 years, 3.1 % interest) | €401 |
This price is a starting point. The builder will prepare a detailed quote based on your plot and your needs. The plot is not included. Items not included are CasaPrefab.es estimates based on average costs.
Comparing quotes with the same scope helps you avoid cost overruns.
Steelo 90: questions and answers
How much does the Steelo 90 cost per square metre?
From about €724/m² (semi-finished). Including what is not included, the estimated total cost is around €1,518/m².
What plot do I need for the Steelo 90?
It depends on the site coverage, setbacks and buildable area your local council allows; check with the builder.
How long does it take to build?
It depends on the model and the permission; ask Steelo about timescales.
Can the floor plan be adapted?
Yes. Steelo adapts the layout; request a free adaptation above.